Weekly Traffic Advisories
Transportation and Infrastructure Renewal
2020-10-23

NEW WORK


DIGBY: Weymouth Falls Road, Weymouth

Weymouth Falls Road, Weymouth, will be closed for culvert repairs until Wednesday, Oct. 28.

A detour is available via Route 340 and Old Yarmouth Road.


CONTINUING WORK


ANNAPOLIS COUNTY: Brickton Bridge, Brickton

Brickton Bridge on Mount Hanley Road is closed for repairs until Friday, Dec.18. Detour is in place.


ANTIGONISH COUNTY: Trunk 4

Trunk 4, Antigonish County, from South River Road to Beech Hill Road, is closed until further notice. The closure will be in effect until permanent upgrades are made to the Beech Hill/Trunk 4 intersection.

A detour is available via South River Road and Beech Hill Road.


CAPE BRETON REGIONAL MUNICIPALITY: Sydney-Glace Bay Highway – Reserve Street/Wilson Road

Roadwork is taking place in two sections on the Sydney-Glace Bay Highway and will continue until Saturday, Oct. 31:

  • Reserve Street/Trunk 4, 600 metres east of Old Airport Road to 260 metres east of Haulage Road will be reduced to one lane
  • Wilson Road/Trunk 4 to Dominion Street, at the old Glace Bay town line, will be reduced to one lane

Traffic control is on site. Work takes place from 7 a.m. to 5 p.m.


COLCHESTER COUNTY: Trunk 4, Lower Debert River Bridge

Trunk 4, at Lower Debert River Bridge, is closed for bridge replacement until Saturday, Oct. 31.

A detour is available via Highway 104 between Exits 11 and 12.


GUYSBOROUGH COUNTY: North Lake Brook Bridge, Larrys River

North Lake Brook Bridge on Cole Harbour Road in Larrys River is closed to all traffic until further notice. Detour is in place.


HALIFAX REGIONAL MUNICIPALITY: Dillmans Bridge, Meaghers Grant

Dillmans Bridge, on Wyse Road in Meaghers Grant, will be closed until further notice. A detour is available via Old Guysborough Road. Signs are in place.


HALIFAX REGIONAL MUNICIPALITY: Peggys Point Road, Peggy's Cove

Peggys Point Road, Peggy’s Cove, from the Visitor Information Centre west for about one kilometre, will be reduced to one lane until March 2021.

Work to take place from sunrise to sunset.


HALIFAX REGIONAL MUNICIPALITY: Perrin Drive, Fall River

Perrin Drive, Fall River, from Trunk 2 to 300 metres east of 107 Perrin Dr., will be reduced to one lane for roadwork until Saturday, Oct. 31.

Work takes place from 7 p.m. to 6 a.m.


HANTS COUNTY: Aylward Road, West Hants

Aylward Road, West Hants from Falmouth Back Road to the end of the road, will be reduced to one lane for paving from Monday, Oct. 19 until Monday, Nov. 30.

Traffic control is on site. Work takes place from sunrise to sunset.


HANTS COUNTY: Dill Road, West Hants

Dill Road, West Hants, from Trunk 14 easterly for about five kilometres, will be reduced to one lane for paving until Monday, Nov. 30.

Traffic control is on site. Work takes place from sunrise to sunset.


HANTS COUNTY: Highway 102, Lantz

A temporary detour is in place on Highway 102 north of Exit 8, Elmsdale, for the replacement of the Nine Mile River bridges, northbound and southbound. This work is part of ongoing construction for the new Lantz Interchange and Connector Road.

The detour has a reduced speed limit of 80 kilometres an hour and is expected to be in place until mid-summer 2021.

The Lantz Interchange and Connector Road is expected to be complete and open to traffic by fall 2021.


HANTS COUNTY: Hydes Bridge

Hydes Bridge in Lantz, on Highway 277, will be closed until further notice.

A detour is in place via Dutch Settlement Road, Elmsdale Road and Trunk 2. Signs are in place.


HANTS COUNTY: McKay Road, Newport

McKay Road, from about three kilometres west of Clayton McKay Road to Woodville Road, will be reduced to one lane for paving until Monday, Nov. 30.

Work takes place from sunrise to sunset.


HANTS COUNTY: Route 214, Elmsdale

Route 214, from Park Road to Old Trunk Road, is reduced to one lane for paving and bridge repairs until Sunday, Nov. 15. Work takes place from 8 p.m. to 7 a.m.


HANTS COUNTY: South Maitland Bridge

South Maitland Bridge on Route 236 is reduced to one lane for repairs until Tuesday, Nov. 17. Signal lights will be in place.


INVERNESS/VICTORIA COUNTY: Five Projects

Roadwork is taking place, in five sections, in Inverness and Victoria County for gravel road maintenance until Sunday, Nov. 15:

  • Southside River Denys Road to Marble Mountain Road westerly will be reduced to one lane
  • Southside River Denys Road, from Northside River Denys Road, southerly for about five kilometres will be reduced to one lane
  • Barra Glen Road from Route 223 to Fraser Road will be reduced to one lane
  • Crandall Road, from Long Stretch Road, southerly for about one kilometre will be reduced to one lane
  • Red Pont Road, from Route 223, southwesterly for about four kilometres will be reduced to one lane

Traffic control is on site. Work takes place from 7 a.m. to 7 p.m.


INVERNESS COUNTY: Highway 105/Route 252, Whycocomagh

The intersection of Highway 105 and Route 252, Whycocomagh, is reduced to one lane until Monday, Nov. 30. Work takes place from 7 a.m. to 7 p.m.


KINGS COUNTY: Bear Brook Bridge, Berwick

Bear Brook Bridge, on Russia Road in Berwick, is closed for repairs until further notice. A detour is in place.


LUNENBURG COUNTY: Frank Swinamer Road, Chester Basin
Frank Swinamer Road, Chester Basin, from North Street to Trunk 3, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: MacCulloch Road, Cookville
MacCulloch Road, Cookville has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Lawrence Hatt Road, Chester Basin
Lawrence Hatt Road, Chester Basin, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Regent Street, Chester
Regent Street, Chester, from Central Street to Brunswick, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Gail Avenue, Lower Branch
Gail Avenue, Lower Branch, from Lower Branch Road to Johanne Drive, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Duke Street, Chester
Duke Street, Chester, from Queen Street to Trunk 3, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Harold Whynot Road, Pine Grove
Harold Whynot Road, Pine Grove, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: River Lane, Pleasantville
River Lane, Pleasantville, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Fire Hall Road, New Germany
Fire Hall Road, New Germany, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Tremont Road, Chester
Tremont Road, Chester, from King Street to Valley Road, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Union Street, Chester

Union Street, Chester, from King Street to Duke Street, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Delong Lane, New Germany

Delong Lane, New Germany, from Barss Corner Road, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: William Hebb Road, Hebbville

William Hebb Road, Hebbville, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Jubilee Road, Hebbville

Jubilee Road, Hebbville, from Trunk 3 to Bridgewater town line, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Chandler Road, Chester

Chandler Road, Chester, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Route 332, Riverport
Route 332, Riverport, from Trunk 3 to Riverport Bridge, has alternating lane closures for paving until Friday, Nov. 27.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Pine Street, Chester

Pine Street, Chester, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Maple Street, Chester

Maple Street, Chester, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Pernette Drive, West LaHave

Pernette Drive, West LaHave, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Nauss Point Road, Chester

Nauss Point Road, Chester, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Cove Road, Conquerall Bank

Cove Road, Conquerall Bank, from Conquerall Road to Route 331, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Prince Street, Chester

Prince Street, Chester, from Pleasant Street to Main Street, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Chester Shore Road, Chester

Chester Shore Road, Chester, from Pig Loop Road to Trunk 3, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Dawson Heights, Pine Grove

Dawson Heights, Pine Grove, from Pine Grove Road to Lohnes Drive, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Charlie Lane, Pine Grove

Charlie Lane, Pine Grove, from Pine Grove Road to Lohnes Drive, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Levi Hebb Road, Wileville

Levi Hebb Road, Wileville, from Upper Branch to end of listing, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Pearl Street, Wileville

Pearl Street, Wileville, from Route 235 to Bridgewater town line, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Cedar Street, Chester

Cedar Street, Chester, from Pine Street to Maple Street, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Main Street, Chester

Main Street, Chester, from Valley Road to Queen Street, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Beech Street, Chester

Beech Street, Chester, from Pine Street to Maple Street, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Darius Wile Road, Wileville

Darius Wile Road, Wileville, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Delong Lane, New Germany

Delong Lane, New Germany, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Bell Avenue, Hebbville

Bell Avenue, Hebbville, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Hillside Drive, Conquerall Bank

Hillside Drive, Conquerall Bank, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Lohnes Drive, Pine Grove

Lohnes Drive, Pine Grove, from Charlie Lane to Dawson Heights, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


LUNENBURG COUNTY: Birch Street, Chester

Birch Street, Chester, from Maple Street to Old Trunk 3, has alternating lane closures for paving until Monday, Nov. 30.

Traffic is stop and go. Work takes place from sunrise to sunset.


RICHMOND COUNTY: Port Royal Bridge

Port Royal Bridge, Port Royal Road on Isle Madame, is closed until further notice. A detour is in place on MacEachern Road.


RICHMOND COUNTY: Three Projects

Gravel road maintenance is taking place in three sections in Richmond County until Monday, Nov. 30:

  • Corbetts Cove Road from Trunk 4 westerly for about four kilometres will be reduced to one lane
  • Hay Cove Road from Trunk 4 southerly for about three kilometres will be reduced to one lane
  • Doyle Road from Route 247 southerly for about one kilometre will be reduced to one lane

Traffic control is on site. Work takes place from 7 a.m. to 7 p.m.


SHELBURNE COUNTY: Highway 103

Highway 103, near Sable River Station to Exit 23, is reduced to one lane, from sunrise to sunset. Lane closures will alternate until Oct. 30. Expect delays.

-30-