"Point in Time" Regulation Content
Assessment Act
Railway, Pipeline, Electric Power and Telecommunications Corporation Rights of Way Valuation Regulation
B.C. Reg. 218/86
NOTE: Links below go to reg content as it was prior to the changes made on the effective date. (PIT covers changes made from September 19, 2009 to present) | |
SECTION | EFFECTIVE DATE |
---|---|
Section 2 | November 30, 2009 |
December 17, 2010 | |
December 5, 2011 | |
December 7, 2012 | |
December 11, 2013 | |
December 10, 2014 | |
December 23, 2015 | |
December 19, 2016 | |
December 20, 2017 | |
December 14, 2018 | |
December 18, 2019 | |
Section 3 | November 30, 2009 |
December 17, 2010 | |
December 5, 2011 | |
December 7, 2012 | |
December 11, 2013 | |
December 10, 2014 | |
December 23, 2015 | |
December 19, 2016 | |
December 20, 2017 | |
December 14, 2018 | |
December 18, 2019 |
Section 2 BEFORE amended by BC Reg 288/2009, effective November 30, 2009.
Application
2 This regulation shall be used for determinations of value for the purposes of assessment for the 2008 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1;
442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1;
488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1.]
Section 2 BEFORE amended by BC Reg 373/2010, effective December 17, 2010.
Application
2 This regulation shall be used for determinations of value for the purposes of assessment for the 2010 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1.]
Section 2 BEFORE amended by BC Reg 222/2011, effective December 5, 2011.
Application
2 This regulation shall be used for determinations of value for the purposes of assessment for the 2011 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1; 373/2010, s. 1.]
Section 2 BEFORE amended by BC Reg 392/2012, effective December 7, 2012.
Application
2 This regulation shall be used for determinations of value for the purposes of assessment for the 2012 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1;
381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1;
373/2010, s. 1; 222/2011, s. 1.]
Section 2 BEFORE amended by BC Reg 253/2013, effective December 11, 2013.
Application
2 This regulation shall be used for determinations of value for the purposes of assessment for the 2013 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1;
442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1;
488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1; 373/2010, s. 1;
222/2011, s. 1.; 392/2012, s. 1.]
Section 2 BEFORE amended by BC Reg 233/2014, effective December 10, 2014.
Application
2 This regulation shall be used for determinations of value for the purposes of assessment for the 2014 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1; 373/2010, s. 1; 222/2011, s. 1; 392/2012, s. 1; 253/2013, s. 1.]
Section 2 BEFORE amended by BC Reg 317/2016 effective December 19, 2016.
Application
2 This regulation shall be used for determinations of value for the purposes of assessment for the 2016 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1; 373/2010, s. 1; 222/2011, s. 1; 392/2012, s. 1; 253/2013, s. 1; 233/2014, s. 1; 264/2015, s. 1.]
Section 2 BEFORE amended by BC Reg 245/2017, effective December 20, 2017.
Application
2 This regulation must be used for determinations of value for the purposes of assessment for the 2017 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1; 373/2010, s. 1; 222/2011, s. 1; 392/2012, s. 1; 253/2013, s. 1; 233/2014, s. 1; 264/2015, s. 1; 317/2016, s. 1.]
Section 2 BEFORE amended by BC Reg 283/2018, effective December 14, 2018.
Application
2 This regulation must be used for determinations of value for the purposes of assessment for the 2018 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1; 373/2010, s. 1; 222/2011, s. 1; 392/2012, s. 1; 253/2013, s. 1; 233/2014, s. 1; 264/2015, s. 1; 317/2016, s. 1; 245/2017, s. 1.]
Section 2 BEFORE amended by BC Reg 283/2019, effective December 18, 2019.
Application
2 This regulation must be used for determinations of value for the purposes of assessment for the 2019 and subsequent taxation years.
[en. B.C. Reg. 285/90, s. 1; am. B.C. Regs. 502/92, s. 1; 457/94, s. 2; 499/95, s. 1; 335/96, s. 1; 442/97, s. 1; 420/98, s. 1; 425/99, s. 1; 381/2000, s. 1; 282/2001, s. 1; 362/2002, s. 1; 488/2003, s. 2; 559/2004, s. 1; 363/2006, s. (a); 351/2007, s. 1; 288/2009, s. 1; 373/2010, s. 1; 222/2011, s. 1; 392/2012, s. 1; 253/2013, s. 1; 233/2014, s. 1; 264/2015, s. 1; 317/2016, s. 1; 245/2017, s. 1; 283/2018, s. 1.]
Section 3, table BEFORE amended by BC Reg 288/2009, effective November 30, 2009.
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) south of the 59th parallel | $5 612 per acre |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) north of the 59th parallel | $208 per acre |
For the track in place of a railway corporation, located on land described in section 1 (1) (c) (iii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96 | $502 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $3 472 per acre |
For the gathering pipelines of a pipeline corporation | $588 per acre |
For the transmission lines of an electrical power corporation | $3 472 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $3 472 per acre |
[am. B.C. Regs. 457/94, s. 3; 499/95, s. 2; 335/96, s. 2; 442/97, s. 2; 420/98, s. 2; 425/99, s. 2; 381/2000, s. 2; 282/2001, s. 2; 362/2002, s. 2; 488/2003, s. 3; 559/2004, s. 2; 363/2006, s. (b); 351/2007, s. 2.]
Section 3, table BEFORE amended by BC Reg 373/2010, effective December 17, 2010.
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) south of the 59th parallel | $5 612 per acre |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) north of the 59th parallel | $208 per acre |
For the track in place of a railway corporation, located on land described in section 1 (1) (c) (iii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96 | $502 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $3 472 per acre |
For the gathering pipelines of a pipeline corporation | $588 per acre |
For the transmission lines of an electrical power corporation | $3 472 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $3 472 per acre |
[am. B.C. Regs. 457/94, s. 3; 499/95, s. 2; 335/96, s. 2; 442/97, s. 2; 420/98, s. 2; 425/99, s. 2; 381/2000, s. 2; 282/2001, s. 2; 362/2002, s. 2; 488/2003, s. 3; 559/2004, s. 2; 363/2006, s. (b); 351/2007, s. 2.]
Section 3, column 2 of the table BEFORE amended by BC Reg 222/2011, effective December 5, 2011.
$7 568 per acre |
$255 per acre |
$502 per acre |
$4 340 per acre |
$778 per acre |
$4 340 per acre |
$4 340 per acre |
Section 3 BEFORE amended by BC Reg 392/2012, effective December 7, 2012.
Determination of value
3 The actual value of the right of way for the items in column 1 of the table must be determined using the rates set out opposite them in column 2:
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) south of the 59th parallel | $7 674 per acre |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) north of the 59th parallel | $310 per acre |
For the track in place of a railway corporation, located on land described in section 1 (1) (c) (iii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96 | $502 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 519 per acre |
For the gathering pipelines of a pipeline corporation | $832 per acre |
For the transmission lines of an electrical power corporation | $4 519 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 519 per acre |
[am. B.C. Regs. 457/94, s. 3; 499/95, s. 2; 335/96, s. 2; 442/97, s. 2; 420/98, s. 2; 425/99, s. 2; 381/2000, s. 2; 282/2001, s. 2; 362/2002, s. 2; 488/2003, s. 3; 559/2004, s. 2; 363/2006, s. (b); 351/2007, s. 2; 288/2009, s. 2; 373/2010, s. 2; 222/2011, s. 2.]
Section 3, table BEFORE amended by BC Reg 253/2013, effective December 11, 2013.
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) south of the 59th parallel | $7 764 per acre |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) north of the 59th parallel | $320 per acre |
For the track in place of a railway corporation, located on land described in section 1 (1) (c) (iii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96 | $520 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 490 per acre |
For the gathering pipelines of a pipeline corporation | $888 per acre |
For the transmission lines of an electrical power corporation | $4 490 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 490 per acre |
Section 3, table BEFORE amended by BC Reg 233/2014, effective December 10, 2014.
Table | |
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) south of the 59th parallel | $8 260 per acre |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) north of the 59th parallel | $800 per acre |
For the track in place of a railway corporation, located on land described in section 1 (1) (c) (iii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96 | $500 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 380 per acre |
For the gathering pipelines of a pipeline corporation | $943 per acre |
For the transmission lines of an electrical power corporation | $4 380 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 380 per acre |
Section 3, table BEFORE amended by BC Reg 264/2015, effective December 23, 2015.
Table | |
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) south of the 59th parallel | $8 890 per acre |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) north of the 59th parallel | $824 per acre |
For the track in place of a railway corporation, located on land described in section 1 (1) (c) (iii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96 | $505 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 340 per acre |
For the gathering pipelines of a pipeline corporation | $1 020 per acre |
For the transmission lines of an electrical power corporation | $4 340 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 340 per acre |
Section 3, table BEFORE amended by BC Reg 317/2016, effective December 19, 2016.
Table | |
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) south of the 59th parallel | $9 630 per acre |
For the track in place of a railway corporation, located on land (a) described in section 1 (1) (c) (i) or (ii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96, and (b) north of the 59th parallel | $840 per acre |
For the track in place of a railway corporation, located on land described in section 1 (1) (c) (iii) of the Criteria for Railway Right of Way Definition Regulation, B.C. Reg. 325/96 | $350 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 260 per acre |
For the gathering pipelines of a pipeline corporation | $1 090 per acre |
For the transmission lines of an electrical power corporation | $4 260 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 260 per acre |
Section 3, table BEFORE amended by BC Reg 245/2017, effective December 20, 2017.
Table | |
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, B.C. Reg. 51/2016, and (b) south of the 59th parallel | $10 340 per acre |
For the track in place of a railway corporation, located on land (a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, and (b) north of the 59th parallel | $880 per acre |
For the track in place of a railway corporation, located on land described in section 2 (1) (c) (iii) of the Railway Corporations Assessment Regulation | $350 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 310 per acre |
For the gathering pipelines of a pipeline corporation | $1 165 per acre |
For the transmission lines of an electrical power corporation | $4 310 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 310 per acre |
Section 3, table BEFORE amended by BC Reg 283/2018, effective December 14, 2018.
Table
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, B.C. Reg. 51/2016, and (b) south of the 59th parallel | $13 500 per acre |
For the track in place of a railway corporation, located on land (a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, and (b) north of the 59th parallel | $900 per acre |
For the track in place of a railway corporation, located on land described in section 2 (1) (c) (iii) of the Railway Corporations Assessment Regulation | $510 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 490 per acre |
For the gathering pipelines of a pipeline corporation | $1 035 per acre |
For the transmission lines of an electrical power corporation | $4 490 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 490 per acre |
Section 3, table BEFORE amended by BC Reg 283/2019, effective December 18, 2019.
Table
Column 1 | Column 2 |
For the track in place of a railway corporation, located on land (a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, B.C. Reg. 51/2016, and (b) south of the 59th parallel | $13 560 per acre |
For the track in place of a railway corporation, located on land (a) described in section 2 (1) (c) (i) or (ii) of the Railway Corporations Assessment Regulation, and (b) north of the 59th parallel | $1 000 per acre |
For the track in place of a railway corporation, located on land described in section 2 (1) (c) (iii) of the Railway Corporations Assessment Regulation | $520 per acre |
For the pipelines of a pipeline corporation, other than gathering pipelines | $4 790 per acre |
For the gathering pipelines of a pipeline corporation | $1 055 per acre |
For the transmission lines of an electrical power corporation | $4 790 per acre |
For the metallic or fibre optic cables of a telecommunications corporation | $4 790 per acre |
- Point in Time - Security Management Regulation - 181/2022
- Point in Time - Pipeline Crossings Regulation - 147/2012
- Point in Time - Energy Resource Activities Act General Regulation - 274/2010
- Energy Resource Activities General Regulation - 274/2010
- Motor Vehicle Prohibition Regulation - 196/99 [Repealed]